Interior Fit-out, Refurbishment & Maintenance

Structural Remedial Work to HSBC ATM

The Principle team were asked by client Interserve to assess the structural fabric of the ATM room at the Bury Mill Gate branch of HSBC, and carry out required structural remedial work.

The main objectives of the project were to:

  • Make the structure safe
  • Make the ATM safe
  • Minimise risk to shoppers and staff by maintaining a safe working environment
  • Return the ATM to full working order as quickly as possible.

Working within a busy shopping centre certainly provided some challenges for the Principle team. We had to ensure that our health and safety was to the highest standards, and ensure working areas were fully secure to minimise disruption to shoppers and staff.

The work carried out included:

  • Set up safe work areas and secure enclosure in front of ATMs
  • Remove ATMs
  • Strip out existing electrical, data and alarms to ATM room
  • Relocate smoke heads
  • Demolish non-conforming walls and rebuild to HSBC security requirements
  • Fit new doors
  • New electrical, data and alarm fit-out
  • Install new ATMs and signage
  • Clean and redecorate front of house area.

The project took just 2 weeks to complete.

Services used

Print version

  • Related case studies

Complete Refurbishment for Yorkshire Building Society

Complete Refurbishment for Yorkshire Building Society

Window Blinds Made To Measure For Banks

Window Blinds Made To Measure For Banks

Rollout Programme to Replace HSBC ATMs

Rollout Programme to Replace HSBC ATMs

External Refurbishment Projects for HSBC Branches

External Refurbishment Projects for HSBC Branches

Excellent Feedback from Interserve for HSBC Project

Excellent Feedback from Interserve for HSBC Project

200+ Sites Completed in Building Society Visual Identity Programme

200+ Sites Completed in Building Society Visual Identity Programme

Fabric Maintenance Service for HSBC

Fabric Maintenance Service for HSBC

Speech Systems Supplied and Installed at HSBC Cairo

Speech Systems Supplied and Installed at HSBC Cairo

Turnkey Fit-out Solution Delivered for Yorkshire Building Society

Turnkey Fit-out Solution Delivered for Yorkshire Building Society

Back of House Refurbishment for HSBC

Back of House Refurbishment for HSBC

Enhanced Interiors Delivered for HSBC Commercial

Enhanced Interiors Delivered for HSBC Commercial

Full Fit-out Service Delivered for State Bank of India

Full Fit-out Service Delivered for State Bank of India

Structural remedial work carried out at HSBC Bury Mill Gate.
Work involved the removal and replacement of ATMs.
0 of 2
Previous Next