Interior Fit-out, Refurbishment & Maintenance

Smoking Shelters Installed by Principle

Although it is now illegal to smoke indoors, many companies still aim to provide employees with a space where they can continue to take their smoking breaks in a comfortable, covered environment.

When an instruction is received, the Principle team will ascertain what size and type of shelter is required, do a site survey to review location and best way to install, and whether it needs to be painted in a particular colour to match a corporate colour scheme.

The shelters are made of long-lasting aluminium and glazed with shatterproof polycarbonate sheets, and are low maintenance. They can also be fitted with seating areas, waste or cigarette bins if required.

From instruction Principle usually complete the project within 3 to 4 weeks.

Services used

Print version

  • Related case studies

High Level Maintenance for Laing O'Rourke

High Level Maintenance for Laing O'Rourke

Induction Loops Installed for NHS

Induction Loops Installed for NHS

Full Turnkey Fit-out Solution for Atkins

Full Turnkey Fit-out Solution for Atkins

EC Harris Headquarters Receive Full Interior Fit-out

EC Harris Headquarters Receive Full Interior Fit-out

Specialist Refurbishment of Grade 2 Listed Building

Specialist Refurbishment of Grade 2 Listed Building

Fast Track Office Refurbishment for Accenture

Fast Track Office Refurbishment for Accenture

Workplace Interiors Delivered for HSBC

Workplace Interiors Delivered for HSBC

Smoking shelters supplied and installed by Principle.
0 of 1
Previous Next