Interior Fit-out, Refurbishment & Maintenance

High Level Maintenance for Laing O'Rourke

The Principle team supply maintenance services for multinational construction company Laing O’Rourke, and recently completed a high level project in Manchester.

Principle was asked to attend site out of hours and fit bespoke high level brackets to support a fall pipe.

The project was completed within 3 weeks from initial order including manufacture of the brackets, and arranging for the job to be completed on a Sunday.

Principle’s specialist team carried out the job using specialised hydraulic access equipment.

Services used

Print version

  • Related case studies

Smoking Shelters Installed by Principle

Smoking Shelters Installed by Principle

Induction Loops Installed for NHS

Induction Loops Installed for NHS

Full Turnkey Fit-out Solution for Atkins

Full Turnkey Fit-out Solution for Atkins

EC Harris Headquarters Receive Full Interior Fit-out

EC Harris Headquarters Receive Full Interior Fit-out

Specialist Refurbishment of Grade 2 Listed Building

Specialist Refurbishment of Grade 2 Listed Building

Fast Track Office Refurbishment for Accenture

Fast Track Office Refurbishment for Accenture

Workplace Interiors Delivered for HSBC

Workplace Interiors Delivered for HSBC

High level maintenance delivered by Principle for Laing O'Rourke.
0 of 1
Previous Next